Pricing Disclosure
Service pricing changes month-to-month based on zip code. Pricing is based on industry standard rates using Xactimate estimating software by Verisk Analytics, Inc. The rates are independently researched and validated from a variety of sources including, but not limited to, general contractors, insurance adjusters, market surveys, retailers, subcontractors, and suppliers.
| CODE | CAT | ITEM DESC. | UNIT | UNIT PRICE | |
|---|---|---|---|---|---|
| ESRV | ADMIN | Emergency service call - after business hours | EA | $253.84 | |
| ESRVD | ADMIN | Emergency service call - during business hours | EA | $169.22 | |
| BARRP | EQUIPMENT | Containment Barrier - tension post - per day | DAY | $3.30 | |
| DHM | EQUIPMENT | Dehumidifier (per 24 hour period) - No monitoring | EA/DAY | $61.00 | |
| DHM> | EQUIPMENT | Dehumidifier (per 24 hour period) - Large - No monitoring | EA/DAY | $91.00 | |
| DHM>> | EQUIPMENT | Dehumidifier (per 24 hourperiod) -XLarge-Nomonitoring | EA/DAY | $120.25 | |
| DHM>>> | EQUIPMENT | Dehumidifier (per 24 hour period) - XXLarge- No monitoring | EA/DAY | $151.75 | |
| DHMAC | EQUIPMENT | Dehumidifier w/environmental control - per 24 hrs | EA/DAY | $126.32 | |
| DHMB | EQUIPMENT | Dehumidifier booster (per 24 hour period) - No monitoring | EA/DAY | $30.00 | |
| DHMD | EQUIPMENT | Dehumidifier (per24 hour period) - Desiccant - No monit. | EA/DAY | $230.00 | |
| DHMD< | EQUIPMENT | Dehumidifier (per 24 hr period) -Small-Desiccant-No monit. | EA/DAY | $125.06 | |
| DHMD> | EQUIPMENT | Dehumidifier (per 24 hr period) -Large-Desiccant-No monit. | EA/DAY | $501.60 | |
| DHMDT2K | EQUIPMENT | Trailer-mount dehumidifier - 2000 CFM- per 24 hr | EA/DAY | $965.00 | |
| DHMDT3K | EQUIPMENT | Dehumidifier - Desiccant -3000-4000 CFM No monit .- per 24hr | EA/DAY | $1,250.00 | |
| DHMDT5K | EQUIPMENT | Dehumidifier - Desiccant -4500-7500 CFM No monit .- per 24hr | EA/DAY | $1,560.00 | |
| DHMDT9K | EQUIPMENT | Dehumidifier - Desiccant-8500-15000 CFM No monit .- per24hr | EA/DAY | $2,574.04 | |
| DRY | EQUIPMENT | Air mover (per 24 hour period) -Nomonitoring | EA/DAY | $32.25 | |
| DRY- | EQUIPMENT | Mini air mover (per 24 hour period) - No monitoring | EA/DAY | $11.27 | |
| DRY+ | EQUIPMENT | Air mover axial fan (per24 hourperiod)- No monitoring | EA/DAY | $39.25 | |
| DRY++ | EQUIPMENT | Axial fan air mover - 1 HP (per 24 hr period)-No monit. | EA/DAY | $43.57 | |
| DRYMA | EQUIPMENT | Multi-port air mover adapter (per 24 hr period)- No monit. | EA/DAY | $32.00 | |
| DRYSA | EQUIPMENT | Air mover snout adapter 48" (per 24 hr period) -No monit. | EA/DAY | $12.96 | |
| EQ | EQUIPMENT | Equipment setup, take down, and monitoring (hourly charge) | HR | $57.90 | |
| EQA | EQUIPMENT | Equip. setup, take down & monitoring - after hrs | HR | $86.93 | |
| EQD | EQUIPMENT | Equipment decontamination charge - per piece of equipment | EA | $33.90 | |
| EQDH | EQUIPMENT | Equipment decontamination charge - HVY, per piece of equip | EA | $53.91 | |
| FHEPA | EQUIPMENT | Add for HEPA filter (for negative air exhaust fan) | EA | $195.42 | |
| FHEPA-c | EQUIPMENT | Add for HEPA filter (for canister/backpack vacuums) | EA | $72.60 | |
| FHEPA-c< | EQUIPMENT | Add for HEPA filter (for upright vacuums) | EA | $35.05 | |
| FHEPA> | EQUIPMENT | Add for HEPA filter (for neg. air machine/vacuum - Large) | EA | $314.34 | |
| FHEPAC | EQUIPMENT | Add for HEPA filter - large cylinder | EA | $153.71 | |
| FURN | EQUIPMENT | Drying furnace - ind. fired heater w/ducting - 85 kBtuh | DAY | $160.00 | |
| FURN10 | EQUIPMENT | Drying furnace - ind. fired heater w/ducting - 100 kBtuh | DAY | $225.00 | |
| FURN17 | EQUIPMENT | Drying furnace - ind. fired heater w/ducting - 170 kBtuh | DAY | $460.00 | |
| FURN25 | EQUIPMENT | Drying furnace - ind. fired heater w/ducting - 250 kBtuh | DAY | $575.00 | |
| FURN40 | EQUIPMENT | Drying furnace - ind. fired heater w/ducting - 400 kBtuh | DAY | $830.00 | |
| HEAT | EQUIPMENT | Heat drying - hydronic boiler/power unit - 200 kBtu | DAY | $600.00 | |
| HEAT> | EQUIPMENT | Heat drying - hydronic boiler/power unit - 250 kBtu | DAY | $900.00 | |
| HEAT» | EQUIPMENT | Heat drying - hydronic boiler/power unit - 300 kBtu | DAY | $1,100.00 | |
| HEATA | EQUIPMENT | Heat drying - ducted air - 200 kBtu - 2300+ cfm | DAY | $1,375.00 | |
| HEATA> | EQUIPMENT | Heat drying - ducted air - 400 kBtu - 5200+ cfm | DAY | $2,200.00 | |
| HEATX | EQUIPMENT | Heat drying - thermal exchanger with air mover - 50 kBtu | DAY | $212.25 | |
| HEATX> | EQUIPMENT | Heatdrying - thermal exchanger with air mover - 80 kBtu | DAY | $300.00 | |
| HTAM | EQUIPMENT | Heat drying - thermal air mover - Electric | DAY | $180.00 | |
| HTAM> | EQUIPMENT | Heat drying - thermal air mover - Electric - Large | DAY | $300.00 | |
| HTAMB | EQUIPMENT | Booster for thermal air mover/exchange system | DAY | $71.00 | |
| HTBL | EQUIPMENT | Drying blanket/mat (per 24 hr period) - No monitoring | EA/DAY | $40.00 | |
| HTIP | EQUIPMENT | Infrared heat panel (per 24 hr period) - No monitoring | EA/DAY | $35.00 | |
| HTSC | EQUIPMENT | Sensored control system for electric heat drying (24 hr) | EA/DAY | $26.00 | |
| HTX | EQUIPMENT | Heat drying - thermal air exchanger | EA | $329.00 | |
| MA5 | EQUIPMENT | Adapter for ducted drying- 5 ports (per 24 hrs)- No monit. | EA/DAY | $42.00 | |
| MA9 | EQUIPMENT | Adapter for ducted drying- 9 ports (per 24 hrs)- No monit. | EA/DAY | $71.00 | |
| NAFAN | EQUIPMENT | Negative air fan/Air scrubber (24 hr period) - No monit. | EA/DAY | $84.00 | |
| NAFAN> | EQUIPMENT | Neg. air fan/Air scrub .- Large (per 24 hr period)-No monit. | EA/DAY | $116.75 | |
| NAFAN> › | EQUIPMENT | Neg. air fan/Air scrub .- XLrg (per 24 hr period)-No monit. | EA/DAY | $149.50 | |
| PLDWD | EQUIPMENT | Power distribution box (per day) | EA | $60.62 | |
| POWD> | EQUIPMENT | Power distribution box - 100+ amp (per day) | EA | $125.00 | |
| POWDW | EQUIPMENT | Power distribution box (per week) | WK | $161.00 | |
| PLDWDW> | EQUIPMENT | Power distribution box - 100+ amp (per week) | WK | $360.00 | |
| RM | EQUIPMENT | Remote monitoring sys. w/up to 10 sensors (per 24 hr prd) | EA/DAY | $55.00 | |
| RMG | EQUIPMENT | Remote monitoring -additional gateway (per 24 hr period) | EA/DAY | $30.00 | |
| RMS | EQUIPMENT | Remote monitoring - each additional sensor (per 24 hr prd) | EA/DAY | $3.00 | |
| WALL | EQUIPMENT | Wall cavity drying-Inj. type (per 24 hr period) No monit. | EA/DAY | $140.00 | |
| WALLD | EQUIPMENT | Wall cavity drying-Dctd type (per 24 hr period) No monit. | EA/DAY | $70.50 | |
| WFD | EQUIPMENT | Wood flr drying - subfloor air flow (per 24 hr) No monit. | EA/DAY | $95.00 | |
| WFDAD | EQUIPMENT | Wood floor drying add-on kit (per 24 hr period) No monit. | EA/DAY | $50.00 | |
| WFI | EQUIPMENT | Wood floor drying extraction mat (per 24 hr prd) No monit. | EA/DAY | $180.00 | |
| ACT | LABOR | Remove wet ceiling tile & drywalland bag for disposal | SF | $1.24 | |
| ACT3 | LABOR | Remove wet ceiling tile & drywall and bag - Cat 3 | SF | $1.82 | |
| ACT3A | LABOR | Remove wet ceiling tile & drywall and bag - Cat 3 aft hrs | SF | $2.66 | |
| ACTA | LABOR | Remove wet ceiling tile & drywall, bag for disp. afterhrs | SF | $1.82 | |
| ACTAS | LABOR | Remove wet ceiling tile w/staples - bagfor disposal | SF | $0.97 | |
| ACTAS3 | LABOR | Remove wet ceiling tile w/staples - bag Cat 3 | SF | $1.43 | |
| ACTAS3A | LABOR | Remove wet ceiling tile w/staples - bag Cat 3 - aft hrs | SF | $2.11 | |
| ACTASA | LABOR | Remove wet ceiling tile w/staples, bag for disp. - afthrs | SF | $1.43 | |
| ACTS | LABOR | Remove wet suspended ceiling tile and bag for disposal | SF | $0.45 | |
| ACTSA | LABOR | Remove wet susp. ceiling tile, bag for disp. - after hrs | SF | $0.64 | |
| ACTSS | LABOR | Remove wet suspended ceiling tile and bag - Cat 3 | SF | $0.64 | |
| ACTSSA | LABOR | Remove wet suspended ceiling tile and bag - Cat 3 aft hrs | SF | $0.92 | |
| BAG | LABOR | Plastic bag - used for disposal of contaminated items | EA | $3.07 | |
| BARR | LABOR | Containment Barrier/Airlock/Decon. Chamber | SF | $0.92 | |
| BARRA | LABOR | Containment Barrier/Airlock/Decon. Chamber - after hours | SF | $1.32 | |
| BASE | LABOR | Tear out baseboard | LF | $0.53 | |
| BASEA | LABOR | Tear out baseboard - after hours | LF | $0.80 | |
| BASEB | LABOR | Tear out baseboard and bag for disposal - up to Cat 3 | LF | $0.98 | |
| BASEBA | LABOR | Tear out baseboard and bag for disp. - up to Cat 3 afthrs | LF | $1.37 | |
| BASED | LABOR | Baseboard - Detach | LF | $1.29 | |
| BASED> | LABOR | Baseboard - Detach - oversized or multi-member | LF | $1.52 | |
| BASEDA | LABOR | Baseboard - Detach-after hours | LF | $1.93 | |
| BASEDA> | LABOR | Baseboard - Detach - oversized or multi-member-after hours | LF | $2.28 | |
| BASERS | LABOR | Baseboard - Detach & reset | LF | $2.15 | |
| BASERS> | LABOR | Baseboard - Detach & reset - oversized or multimember | LF | $2.54 | |
| BC | LABOR | Tear out non-salvageable cement board & bag for disposal | SF | $1.36 | |
| BCA | LABOR | Tear out non-salv. cement board & bag for disposal-aft hrs | SF | $1.97 | |
| BCN | LABOR | Tear out non-salvageable cement board, no bagging | SF | $1.06 | |
| BCNA | LABOR | Tear out non-salvageable cement board, no bag - after hrs | SF | $1.59 | |
| BCS | LABOR | Tear out non-salvageable cement board & bag - Cat 3 water | SF | $1.97 | |
| BCSA | LABOR | Tear out non-salv. Cement board & bag - Cat3 wtr - afthrs | SF | $2.87 | |
| BCSN | LABOR | Tear out non-salvageable cement board, no bagging - Cat 3 | SF | $1.59 | |
| NCSNA | LABOR | Tear out non-salv. cement board, no bag - Cat 3- after hrs | SF | $2.38 | |
| BLK | LABOR | Block and pad furniture in room | EA | $52.00 | |
| BLK< | LABOR | Block and pad furniture in room - Small amount | EA | $43.13 | |
| BLK> | LABOR | Block and pad furniture in room - Large amount | EA | $70.85 | |
| BLKA | LABOR | Block and pad furniture in room - after hours | EA | $78.18 | |
| BLKA< | LABOR | Block and pad furniture in room - Small amount - after hrs | EA | $64.92 | |
| BLKA> | LABOR | Block and pad furniture in room - Large amount - after hrs | EA | $106.50 | |
| BLKHR | LABOR | Block and pad furniture - hourlycharge | HR | $59.91 | |
| BLKHRA | LABOR | Blockand pad furniture - hourly charge - after hours | HR | $88.94 | |
| BMUD | LABOR | Add on to tear out mortar bed for tile | SF | $1.86 | |
| CABFH | LABOR | Tear out cabinetry - full height unit | LF | $11.51 | |
| CABFHA | LABOR | Tear out cabinetry - full height unit - after hours | LF | $17.26 | |
| CABFHD | LABOR | Cabinet - full height unit - Detach | LF | $20.85 | |
| CABFHDA | LABOR | Cabinet - full height unit - Detach - after hours | LF | $31.28 | |
| CABLDS | LABOR | Cabinet - lower (base) unit w/shoring - Detach | LF | $31.22 | |
| CABLDSA | LABOR | Cabinet - lower (base) unit w/shoring - Detach - after hrs | LF | $46.39 | |
| CABLOW | LABOR | Tear out cabinetry - lower (base) units | LF | $9.60 | |
| CABLOWA | LABOR | Tear out cabinetry - lower (base) units - after hours | LF | $14.39 | |
| CABLWD | LABOR | Cabinet - lower (base) unit - Detach | LF | $20.93 | |
| CABLWDA | LABOR | Cabinet - lower (base) unit - Detach - after hours | LF | $31.39 | |
| CABUP | LABOR | Tear out cabinetry - upper (wall) units | LF | $9.60 | |
| CABUPA | LABOR | Tear out cabinetry - upper (wall) units - after hours | LF | $14.39 | |
| CABUPD | LABOR | Cabinet - upper (wall) unit - Detach | LF | $17.90 | |
| CABUPDA | LABOR | Cabinet - upper (wall) unit - Detach - after hours | LF | $26.84 | |
| CABVAN | LABOR | Tear out cabinetry - vanity | LF | $9.60 | |
| CABVANA | LABOR | Tear out cabinetry - vanity - after hours | LF | $14.39 | |
| CABVNC | LABOR | Tear out cabinetry - vanity and countertop | LF | $11.98 | |
| CABVNCA | LABOR | Tear out cabinetry - vanity and countertop - after hours | LF | $17.97 | |
| CABVND | LABOR | Cabinet - vanity unit - Detach | LF | $17.90 | |
| CABVNDA | LABOR | Cabinet - vanity unit - Detach - after hours | LF | $26.84 | |
| CSV | LABOR | Remove polyethylene vapor barrier | SF | $0.11 | |
| CTFBSD | LABOR | Backsplash - flat laid/solid surface - Detach | LF | $1.37 | |
| CTFBSDA | LABOR | Backsplash - flat laid/solid surface - Detach- after hours | LF | $2.05 | |
| CTFL | LABOR | Tear out countertop - flat laid plastic laminate | LF | $5.51 | |
| CTFLA | LABOR | Tear out countertop - flat laidplasticlam.-afterhours | LF | $8.27 | |
| CTFLD | LABOR | Countertop - flat laid plastic laminate - Detach | LF | $6.82 | |
| CTFLDA | LABOR | Countertop - flat laid plastic lam. - Detach - after hours | LF | $10.23 | |
| CTPF | LABOR | Tear out countertop - post formed plastic laminate | LF | $5.30 | |
| CTPFA | LABOR | Tear out countertop - post formed plastic lam. - after hrs | LF | $7.94 | |
| CTPFD | LABOR | Countertop - post formed plastic laminate - Detach | LF | $6.52 | |
| CTPFDA | LABOR | Countertop - post formed plastic lam. - Detach - after hrs | LF | $9.78 | |
| CTSS | LABOR | Tear out countertop - solid surface/granite | SF | $5.51 | |
| CTSSA | LABOR | Tear out countertop - solid surface/granite - after hours | SF | $8.27 | |
| CTSSD | LABOR | Countertop- solid surface/granite - Detach | SF | $9.01 | |
| CTSSDA | LABOR | Countertop - solid surface/granite - Detach - after hours | SF | $13.61 | |
| DORSLD | LABOR | Interior door slab only - Detach | EA | $6.88 | |
| DORSLDA | LABOR | Interior door slab only- Detach - after hours | EA | $10.32 | |
| DRYED | LABOR | Dryer - electric - Detach | EA | $22.32 | |
| DRYEDA | LABOR | Dryer - electric - Detach - after hours | EA | $33.50 | |
| DRYGD | LABOR | Dryer - gas - Detach | EA | $34.11 | |
| DRYGDA | LABOR | Dryer - gas - Detach - after hours | EA | $51.16 | |
| DRYN | LABOR | Tear out wet drywall, no bagging | SF | $0.79 | |
| DRYN4 | LABOR | Tear out wet drywall, no bagging, per LF - up to 4' tall | LF | $4.32 | |
| DRYN4A | LABOR | Tear out wet drywall, no bagging, per LF - 4' aft hrs | LF | $6.49 | |
| DRYN4S | LABOR | Tear out wet drywall, no bagging, perLF - to 4' - Cat 3 | LF | $6.49 | |
| DRYN4SA | LABOR | Tear out wet drywall, no bagging, LF - 4' Cat 3 aft hrs | LF | $9.23 | |
| DRYNA | LABOR | Tear out wet drywall, no bagging - after hours | SF | $1.17 | |
| DRYNI | LABOR | Tear out wet drywall, no bagging, per LF - up to 4" tall | LF | $3.07 | |
| DRYNIA | LABOR | Tear out wet drywall, no bagging, per LF - 4"aft hrs | LF | $4.62 | |
| DRYNIS | LABOR | Tear out wet drywall, no bagging, per LF - to 4" - Cat 3 | LF | $4.62 | |
| DRYNISA | LABOR | Tear out wet drywall, no bagging, LF - 4" Cat 3 aft hrs | LF | $6.94 | |
| DRYNLF | LABOR | Tear out wet drywall, no bagging, per LF - up to 2' tall | LF | $3.15 | |
| DRYNLFA | LABOR | Tear out wet drywall, no bagging, per LF - 2' aft hrs | LF | $4.73 | |
| DRYNLS | LABOR | Tear out wet drywall, no bagging, per LF - to 2' - Cat 3 | LF | $4.73 | |
| DRYNLSA | LABOR | Tear out wet drywall, no bagging, LF - 2' Cat 3 aft hrs | LF | $7.08 | |
| DRYNS | LABOR | Tear out wet drywall, no bagging - Cat 3 | SF | $1.17 | |
| DRYNSA | LABOR | Tear out wet drywall, no bagging - Cat 3 -after hours | SF | $1.75 | |
| DRYW | LABOR | Tear out wet drywall, cleanup, bag for disposal | SF | $1.03 | |
| DRYW4 | LABOR | Tear out wet drywall, cleanup, bag, per LF - up to 4' tall | LF | $5.43 | |
| DRYW4A | LABOR | Tear out wet drywall, cleanup, bag, per LF - 4' aft hrs | LF | $7.81 | |
| DRYW4S | LABOR | Tear outwetdrywall, cleanup,bag, perLF- to 4'-Cat3 | LF | $7.81 | |
| DRYW4SA | LABOR | Tear out wet drywall, cleanup, bag, LF - 4" Cat 3 aft hrs | LF | $10.83 | |
| DRYWA | LABOR | Tear out wet drywall, cleanup, bag - after hours | SF | $1.46 | |
| DRYWG | LABOR | Add-on cost for tearing out glued-on drywall | SF | $0.46 | |
| DRYWGA | LABOR | Add-on cost for tearing out glued-on drywall - after hours | SF | $0.68 | |
| DRYWH | LABOR | Add for wetdrywall onhigh walls -11' to14" high | SF | $0.18 | |
| DRYWH> | LABOR | Add for wet drywall on high walls - 14' to 20' high | SF | $0.25 | |
| DRYWHA | LABOR | Add for wet drywall on high walls- 11' to 14" high-aft hrs | SF | $0.28 | |
| DRYWHA> | LABOR | Add for wet drywall on high walls- 14' to 20' high-aft hrs | SF | $0.38 | |
| DRYWI | LABOR | Tearout wet drywall, cleanup, bag, per LF - up to 4" tall | LF | $3.45 | |
| DRYWIA | LABOR | Tear out wet drywall, cleanup, bag, per LF - 4" aft hrs | LF | $5.14 | |
| DRYWIS | LABOR | Tear out wet drywall, cleanup, bag, per LF - to 4" - Cat 3 | LF | $5.14 | |
| DRYWISA | LABOR | Tear out wet drywall, cleanup, bag, LF - 4" Cat 3 aft hrs | LF | $7.69 | |
| DRYWLF | LABOR | Tear out wet drywall, cleanup, bag, per LF - up to 2' tall | LF | $3.81 | |
| DRYWLFA | LABOR | Tear out wet drywall, cleanup, bag, per LF - 2' afthrs | LF | $5.54 | |
| DRYWLS | LABOR | Tear out wet drywall, cleanup, bag, per LF - to 2' - Cat 3 | LF | $5.54 | |
| DRYWLSA | LABOR | Tear out wet drywall, cleanup, bag, LF - 2' Cat 3 aft hrs | LF | $8.14 | |
| DRYWS | LABOR | Tear out wet drywall, cleanup, bag - Cat 3 | SF | $1.46 | |
| DRYWSA | LABOR | Tearout wet drywall,cleanup,bag- Cat 3 -after hours | SF | $2.10 | |
| DWD | LABOR | Dishwasher - Detach | EA | $57.88 | |
| DWDA | LABOR | Dishwasher-Detach-afterhours | EA | $86.84 | |
| EXT | LABOR | Water extraction from carpeted floor | SF | $0.52 | |
| EXT+ | LABOR | Water extraction from carpeted floor - Heavy | SF | $0.64 | |
| EXTA | LABOR | Water extraction from carpeted floor- after hours | SF | $0.77 | |
| EXTA+ | LABOR | Water extraction from carpeted floor - Heavy - after hours | SF | $0.94 | |
| EXTG | LABOR | Water extraction from carpeted floor - Category 2water | SF | $0.82 | |
| EXTG+ | LABOR | Water extraction from carpeted floor - Cat 2 water - Heavy | SF | $0.97 | |
| EXTGA | LABOR | Water extract from carpeted floor - Cat 2 wtr- after hours | SF | $1.25 | |
| EXTGA+ | LABOR | Water extract carpeted fir - Cat 2 wtr - Heavy- after hrs | SF | $1.48 | |
| EXTH | LABOR | Water extraction from hard surface floor | SF | $0.24 | |
| EXTHA | LABOR | Water extraction from hard surface floor -after hours | SF | $0.37 | |
| EXTHG | LABOR | Water extraction from hard surface floor - Cat 2water | SF | $0.42 | |
| EXTHGA | LABOR | Water extract from hrd surf fir - Cat 2 wtr - after hours | SF | $0.66 | |
| EXTHS | LABOR | Water extraction from hard surface floor - Cat 3 water | SF | $0.78 | |
| EXTHSA | LABOR | Water extract from hard surf fir - Cat 3 wtr - after hours | SF | $1.26 | |
| EXTS | LABOR | Water extraction from carpeted floor - Category3 water | SF | $1.31 | |
| EXTS+ | LABOR | Water extraction from carpeted floor - Cat3 water - Heavy | SF | $1.56 | |
| EXTSA | LABOR | Water extract from carpeted floor - Cat 3 wtr- after hours | SF | $1.92 | |
| EXTSA+ | LABOR | Water extract carpeted floor - Cat 3 wtr- Hvy- after hours | SF | $2.29 | |
| EXTW | LABOR | Water extraction from floor - Weight-assisted | SF | $0.99 | |
| EXTWA | LABOR | Water extraction floor - Weight-assisted - after hours | SF | $1.66 | |
| EXTWP | LABOR | Pumping & hauling ofstanding Category 3 water | GAL | $0.91 | |
| EXTWPA | LABOR | Pumping & hauling of standing Cat 3 water - after hours | GAL | $1.40 | |
| EXTWPC | LABOR | 2" Submersible pump with hose(per hour) | HR | $63.53 | |
| EXTWPT | LABOR | 2" Submersible trash pump with hose (per hour) | HR | $65.03 | |
| EXTWPTM | LABOR | Pumping of standing water - truck mounted (per hour) | HR | $212.90 | |
| FCC | LABOR | Tear out wet non-salvageable carpet, cut & bag for disp. | SF | $0.62 | |
| FCCA | LABOR | Tear out wet non-salvage cpt,cut/bag -afterhours | SF | $0.90 | |
| FCCGD | LABOR | Tear out wet non-salvageable gluedown carpet, cut/bag | SF | $1.07 | |
| FCCGDA | LABOR | Tear out wet non-salv. gluedn. cpt, cut/bag- after hours | SF | $1.58 | |
| FCCGDN | LABOR | Tear out wet non-salvageable glue down carpet, no bagging | SF | $0.84 | |
| FCCGDNA | LABOR | Tear out wet non-salv. gluedn. cpt, no bag - after hours | SF | $1.26 | |
| FCCGDS | LABOR | Tear out wet non-salv. gluedn. cpt, cut/bag - Cat 3 water | SF | $1.58 | |
| FCCGDSA | LABOR | Tear out wet non-salv.gluedn.cpt, cut/bg-Cat 3 wtr-aft. hrs | SF | $2.32 | |
| FCCGSN | LABOR | Tear out wet non-salv. glue down cpt, no bag - Cat 3 water | SF | $1.26 | |
| FCCGSNA | LABOR | Tear out wet non-salv.gluedn.cpt, no bag-Cat 3 wtr-aft. hrs | SF | $1.88 | |
| FCCN | LABOR | Tear outwetnon-salvageable carpet, no bagging | SF | $0.35 | |
| FCCNA | LABOR | Tear out wet non-salvage carpet, no bag - after hours | SF | $0.53 | |
| FCCS | LABOR | Tear out wet non-salvageable carpet, cut/bag - Cat 3 water | SF | $0.90 | |
| FCCSA | LABOR | Tear out wet non-salv. cpt, cut/bag-Cat 3 wtr - after hrs | SF | $1.30 | |
| FCCSN | LABOR | Tear out wet non-salvageable carpet, no bag - Cat 3 water | SF | $0.53 | |
| FCCSNA | LABOR | Tear out wet non-salv. cpt, no bag- Cat 3 wtr - after hrs | SF | $0.79 | |
| FCT | LABOR | Tear out non-salvageable tile floor & bag for disposal | SF | $3.87 | |
| FCTA | LABOR | Tear out non-salv. tile floor & bag for disposalafter hrs | SF | $5.69 | |
| FCTN | LABOR | Tear out non-salvageable tile floor, no bagging | SF | $3.19 | |
| FCTNA | LABOR | Tear out non-salvageable tile floor, no bagging- after hrs | SF | $4.80 | |
| FCTS | LABOR | Tear out non-salvageable tile floor & bag - Cat 3 water | SF | $5.69 | |
| FCTSA | LABOR | Tear out non-salv. tile floor & bag - Cat 3 water-aft hrs | SF | $8.42 | |
| FCTSN | LABOR | Tear out non-salvageable tile floor, no bagging - Cat 3 | SF | $4.80 | |
| FCTSNA | LABOR | Tear out non-salv. tile floor, no bagging - Cat 3- aft hrs | SF | $7.19 | |
| FCV | LABOR | Tear out non-salvageable vinyl, cut & bag for disposal | SF | $1.51 | |
| FCVA | LABOR | Tear outnon-salvageable vinyl, cut & bag - after hrs | SF | $2.19 | |
| FCVL | LABOR | Tear out non-salv vinyl, cut & bag - additional layer | SF | $0.53 | |
| FCVLA | LABOR | Tear out non-salv vinyl, cut & bag - add'l layer after hrs | SF | $0.75 | |
| FCVN | LABOR | Tear out non-salvageable vinyl, no bagging | SF | $1.21 | |
| FCVNA | LABOR | Tear out non-salvageable vinyl, no bagging - after hours | SF | $1.81 | |
| FCVS | LABOR | Tear out non-salv vinyl, cut & bag - Category 3 water | SF | $2.19 | |
| FCVSA | LABOR | Tear out non-salv vinyl, cut & bag - Cat 3 water-after hrs | SF | $3.38 | |
| FCVSL | LABOR | Tear out non-salv vinyl, cut & bag - Cat 3 wtr - additional layer | SF | $0.75 | |
| FCVSLA | LABOR | Tear out non-salv vinyl, cut & bag - Cat3 additional layer after hrs | SF | $1.14 | |
| FCVSN | LABOR | Tear out non-salv vinyl, no bagging - Category 3 water | SF | $1.81 | |
| FCVSNA | LABOR | Tear out non-salv vinyl, no bagging - Cat 3 water-aft. hrs | SF | $2.71 | |
| FCVT | LABOR | Tear out non-salvageable vinyl tile, cut & bag for disp. | SF | $1.71 | |
| FCVTA | LABOR | Tear out non-salv. vinyl tile, cut & bag for disp. Aft hrs | SF | $2.54 | |
| FCVTS | LABOR | Tear out non-salv. vinyl tile, cut & bag for disp. Cat 3 | SF | $2.54 | |
| FCVTSA | LABOR | Tear out non-salv. vinyl tile,cut & bag-Cat3 -aft.hrs | SF | $3.79 | |
| FCVTSN | LABOR | Tear out non-salv. vinyl tile, no bagging - Cat 3 | SF | $1.96 | |
| FCVTSNA | LABOR | Tear out non-salv. vinyl tile, no bag - Cat 3 - aft. hrs | SF | $2.94 | |
| FCVUSN | LABOR | Tear out vinyl & underlay,no bagging -Cat 3 water | SF | $2.39 | |
| FCVUSNA | LABOR | Tear out vinyl & underlay, no bag - Cat 3 - after hours | SF | $3.60 | |
| FCVUV | LABOR | Tear out non-salv. vinyl & underlay, cut & bag for disp. | SF | $2.05 | |
| FCVUVA | LABOR | Tear out vinyl & underlay, bag for disp. - after hours | SF | $3.03 | |
| FCVUVS | LABOR | Tear out vinyl & underlay, bag for disp. - Cat 3 water | SF | $3.03 | |
| FCVUVSA | LABOR | Tear out vinyl & underlay & bag - Cat 3 water - after hrs | SF | $4.48 | |
| FCW | LABOR | Tear out non-salv solid/eng. wood flr &bagfordisposal | SF | $3.83 | |
| FCWA | LABOR | Tear out non-salv solid/eng. wood flr & bag - after hrs | SF | $5.61 | |
| FCWGC | LABOR | Add for tear out wd fir glued down over concrete substrate | SF | $1.92 | |
| FCWGCA | LABOR | Add for tear out wd flr glued down over concrete-after hrs | SF | $2.87 | |
| FCWL | LABOR | Add for tear outwood floor glued down over wood substrate | SF | $3.84 | |
| FCWLA | LABOR | Add for tear out wood floor glued down over wood-after hrs | SF | $5.76 | |
| FCWLN | LABOR | Tear out non-salv floating floor & bag for disposal | SF | $1.95 | |
| FCWLA | LABOR | Tear out non-salv floating floor & bag - after hrs | SF | $2.90 | |
| FCWLN | LABOR | Tear out non-salv floating floor, no bagging | SF | $1.54 | |
| FCWLNA | LABOR | Tear out non-salv floating floor, no bagging - after hours | SF | $2.32 | |
| FCWLS | LABOR | Tear out non-salv floating floor & bag - Category 3 water | SF | $2.90 | |
| FCWLSA | LABOR | Tear out non-salv floating floor & bag - Cat 3 wtr-aft hrs | SF | $4.29 | |
| FCWLSN | LABOR | Tear out non-salv floating floor, nobagging - Category3 | SF | $2.32 | |
| FCWLSNA | LABOR | Tear out non-salv floating floor, no bag -Cat3 -afthrs | SF | $3.48 | |
| FCWN | LABOR | Tear out non-salvageable wood flooring,nobagging | SF | $3.10 | |
| FCWNA | LABOR | Tear out non-salv. wood flooring, no bagging - after hours | SF | $4.64 | |
| FCWS | LABOR | Tear out non-salv wood floor & bag - Category3 water | SF | $5.61 | |
| FCWSA | LABOR | Tear out non-salv wood floor & bag - Cat 3 water - aft hrs | SF | $8.72 | |
| FCWSC | LABOR | Screen woodfloor | SF | $0.48 | |
| FCWSN | LABOR | Tear out non-salv wood floor, no bagging - Category 3 | SF | $4.64 | |
| FCWSNA | LABOR | Tear out non-salv wood floor, no bag - Cat 3 - aft. hrs | SF | $6.96 | |
| FLD | LABOR | Add on to tear out floor drain - tub/shower- metal/plastic | EA | $9.58 | |
| HDRY | LABOR | Hang dry carpet in plant | SF | $0.61 | |
| HDRY+ | LABOR | Hang dry custom oriental rug inplant | SF | $0.91 | |
| HEPAF | LABOR | HEPA Vacuuming exposed framing - Floor - (PER SF) | SF | $1.13 | |
| HEPAFSH | LABOR | HEPA Vacuuming exposed framing w/ sheathing - Floor | SF | $1.82 | |
| H EPAVAC | LABOR | HEPA Vacuuming - hourly charge | H | $61.03 | |
| H EPAVAL | LABOR | HEPAVacuuming - Light - (PER SF) | SF | $0.36 | |
| H EPAVA 5. | LABOR | HEPA Vacuuming - Detailed - (PER SF) | SF | $0.71 | |
| H EPAW | LABOR | HEPA Vacuuming exposed framing - Walls - (PER SF) | SF | $0.66 | |
| HEPAWSH | LABOR | HEPA Vacuuming exposed framing w/ sheathing - Walls | SF | $1.28 | |
| INS | LABOR | Tear out and bag wet insulation | SF | $0.85 | |
| INSA | LABOR | Tear out and bag wet insulation - after hours | SF | $1.23 | |
| INSC | LABOR | Tear out and bag wet insulation in confined space | SF | $1.63 | |
| INSCN | LABOR | Tear out wet insulation in confined space, no bagging | SF | $1.36 | |
| INSCNA | LABOR | Tear out wet insul. confined space, no bagging - aft hrs | SF | $2.05 | |
| INSCS | LABOR | Tear out and bag wet insulation in confined space - Cat 3 | SF | $2.42 | |
| INSCSA | LABOR | Tear out and bag wet insul. confined space-Cat 3- aft hrs | SF | $3.58 | |
| INSCSN | LABOR | Tear out wet insul. in confined space, no bagging - Cat 3 | SF | $2.05 | |
| INSCSNA | LABOR | Tear out wet insul. conf space, no bagging- Cat 3-aft hrs | SF | $3.07 | |
| INSN | LABOR | Tear out wet insulation, no bagging | SF | $0.68 | |
| INSNA | LABOR | Tear out wet insulation, no bagging - after hours | SF | $1.02 | |
| INSS | LABOR | Tear outand bagwetinsulation - Category3water | SF | $1.23 | |
| INSSA | LABOR | Tear out and bag wet insulation - Category 3 - after hours | SF | $1.82 | |
| INSCN | LABOR | Tear out wet insulation, no bagging - Category 3water | SF | $1.02 | |
| INSSNA | LABOR | Tear out wet insulation, no bagging - Cat 3 - after hours | SF | $1.53 | |
| LAB | LABOR | Water Extraction & Remediation Technician -per hour | HR | $57.90 | |
| LABA | LABOR | Water Extraction & Remediation Technician - after hours | HR | $86.93 | |
| LABC | LABOR | Cleaning Technician - per hour | HR | $47.50 | |
| LABCA | LABOR | Cleaning Technician - after hours | HR | $71.33 | |
| LABS | LABOR | Cleaning & Remediation - Supervisory - per hr | HR | $63.46 | |
| LABSA | LABOR | Cleaning & Remediation - Supervisory - after hours | HR | $95.29 | |
| LIFT | LABOR | Lift carpet for drying | SF | $0.41 | |
| LIFTA | LABOR | Lift carpet for drying - after hours | SF | $0.62 | |
| MN | LABOR | Water Extraction & Remediation - Labor Minimum | EA | $144.76 | |
| MR | LABOR | Per job charge for 3rd party monitoring/review (Bid Item) | EA | $0.00 | |
| MUCK | LABOR | Muck-out/Flood loss cleanup | EA | $1.81 | |
| MUCK- | LABOR | Muck-out/Flood loss cleanup - Light | SF | $0.80 | |
| MUCK-F | LABOR | Muck-out/Flood loss cleanup - Heavy | SF | $3.61 | |
| MUCKCS | LABOR | Muck-out/Flood loss cleanup - confined space | SF | $2.58 | |
| MUCKCS- | LABOR | Muck-out/Flood loss cleanup - confined space - Light | SF | $1.15 | |
| MUCKCS- | LABOR | Muck-out/Flood loss cleanup - confined space - Heavy | SF | $5.16 | |
| MUCKHR | LABOR | Muck-out/Flood loss cleanup - per hour (Labor only) | SF | $43.36 | |
| PAD | LABOR | Tear out wet carpet pad and bag for disposal | SF | $0.59 | |
| PADA | LABOR | Tear out wet carpet pad, cut/bag - after hours | SF | $0.85 | |
| PADN | LABOR | Tear out wet carpet pad, no bagging | SF | $0.17 | |
| PADNA | LABOR | Tear out wet carpet pad, no bagging - after hours | SF | $0.26 | |
| PADS | LABOR | Tear out wet carpet pad, cut/bag - Category 3 water | SF | $0.85 | |
| PADSA | LABOR | Tear out wet carpet pad, cut/bag - Cat 3 wtr - after hours | SF | $1.25 | |
| PADSN | LABOR | Tear out wet carpet pad, no bagging - Category 3 water | SF | $0.26 | |
| PADSNA | LABOR | Tear out wet carpet pad, no bag - Cat 3 wtr - after hours | SF | $0.38 | |
| PLA | LABOR | Tear out wet plaster, cleanup, bag for disposal | SF | $2.34 | |
| PLAA | LABOR | Tear out wet plaster, cleanup, bag - after hours | SF | $3.40 | |
| PLAS | LABOR | Tear out wet plaster, cleanup, bag - Category 3 water | SF | $3.40 | |
| PLASA | LABOR | Tear out wet plaster, cleanup, bag - Cat 3 - after hours | SF | $5.01 | |
| PLASN | LABOR | Tear out wet plaster, no bagging - Category 3 water | SF | $2.74 | |
| PLASNA | LABOR | Tear out wet plaster, no bagging - Cat 3 -after hours | SF | $4.11 | |
| PLYTK | LABOR | Tear out toe kick and bag for disposal | LF | $3.37 | |
| PLYTKA | LABOR | Tear out toe kick and bag for disposal - after hours | LF | $4.88 | |
| PLYTKS | LABOR | Tear out toe kick and bag for disposal - Category 3 | LF | $4.02 | |
| PLYTKSA | LABOR | Tear out toe kick and bag for disposal - Cat 3 - afthrs | LF | $5.94 | |
| PLYTSN | LABOR | Tear out toe kick, no bagging - Category 3 | LF | $3.55 | |
| PINSNA | LABOR | Tear out toe kick, no bagging - Cat 3 - aft hrs | LF | $5.33 | |
| PNL | LABOR | Tear out wet paneling, bag for disposal | SF | $0.65 | |
| PNLA | LABOR | Tear out wet paneling, bag for disposal - after hours | SF | $0.91 | |
| PNLS | LABOR | Tear out wet paneling, bag for disposal - Cat 3 | SF | $0.92 | |
| PNLSA | LABOR | Tear out wet paneling,bagfordisp. - Cat 3 - afterhours | SF | $1.33 | |
| PNLSN | LABOR | Tear out wet paneling, no bagging - Cat 3 | SF | $0.63 | |
| PNLSNA | LABOR | Tear out wetpaneling, no bagging- Cat 3 - afterhours | SF | $0.96 | |
| RFD | LABOR | Refrigerator - Detach | EA | $29.76 | |
| RFDA | LABOR | Refrigerator - Detach - after hours | EA | $44.65 | |
| RGED | LABOR | Range - freestanding - electric - Detach | EA | $22.32 | |
| RGEDA | LABOR | Range - freestanding - electric - Detach - after hours | EA | $33.50 | |
| RGGD | LABOR | Range - freestanding - gas - Detach | EA | $39.68 | |
| RGGDA | LABOR | Range - freestanding - gas - Detach - after hours | EA | $59.53 | |
| SANDF | LABOR | Sand exposed framing - Floor | SF | $2.11 | |
| SANDW | LABOR | Sand exposed framing - Walls | SF | $1.14 | |
| SBIF | LABOR | Dry ice blasting exposed framing - Floor (PER SF) | SF | $6.25 | |
| SBSFSH | LABOR | Dry ice blast exposed framing w/sheathing - Floor (PER SF) | SF | $10.13 | |
| SBIW | LABOR | Dry ice blasting exposed framing - Walls (PER SF) | SF | $3.68 | |
| SBIWSH | LABOR | Dry ice blast exposedframing w/sheathing - Walls (PER SF) | SF | $7.09 | |
| SBSF | LABOR | Soda blasting exposed framing - Floor (PER SF) | SF | $4.56 | |
| SBSFSH | LABOR | Soda blasting exposed framing w/sheathing - Floor (PER SF) | SF | $7.48 | |
| 565W | LABOR | Soda blasting exposed framing - Walls (PER SF) | SF | $2.67 | |
| SBSWSH | LABOR | Soda blasting exposed framing w/sheathing - Walls (PER SF) | SF | $5.23 | |
| SF | LABOR | Tear out subfloor & bag for disposal | SF | $1.89 | |
| SFA | LABOR | Tear out subfloor & bag for disposal - after hrs | SF | $2.78 | |
| SFS | LABOR | Tear out subfloor & bag for disposal - Category 3 | SF | $2.78 | |
| SFSA | LABOR | Tear out subfloor & bag fordisposal- Cat 3 - aft hrs | SF | $4.16 | |
| SFSL | LABOR | Tear out subfloor, sleepers & bag for disposal | SF | $2.22 | |
| SFSLA | LABOR | Tear out subfloor, sleepers & bag for disposal - after hrs | SF | $3.28 | |
| SFSLS | LABOR | Tear out subflr, sleepers & bag for disposal - Category 3 | SF | $3.28 | |
| SFSLSA | LABOR | Tear out subfir, sleepers & bag for disp - Cat 3 - aft hrs | SF | $4.89 | |
| SFSLSN | LABOR | Tear out subfir, sleepers, no bagging - Category 3 | SF | $2.52 | |
| SFSLSNA | LABOR | Tear out subfir, sleepers, no bagging - Cat 3 - aft hrs | SF | $3.78 | |
| SFSN | LABOR | Tear out subfloor, no bagging - Category 3 | SF | $2.52 | |
| SFSNA | LABOR | Tear out subfloor, no bagging - Cat 3 - aft hrs | SF | $3.22 | |
| SNKD | LABOR | Sink - single basin - Detach | EA | $30.90 | |
| SNKDA | LABOR | Sink - single basin - Detach - after hours | EA | $46.35 | |
| SNKDD | LABOR | Sink - double basin - Detach | EA | $33.01 | |
| SNKDDA | LABOR | Sink- double basin - Detach - after hours | EA | $49.51 | |
| SNKPD | LABOR | Pedestal sink - Detach | EA | $87.82 | |
| SNKPDA | LABOR | Pedestal sink - Detach - after hours | EA | $51.05 | |
| SNKUD | LABOR | Sink-undermount-Detach | EA | $76.57 | |
| SNKUDA | LABOR | Sink - undermount - Detach - after hours | EA | $90.61 | |
| SWRCC | LABOR | Add on to tear out tile concrete shower curb - per LF | LF | $7.99 | |
| SWRCF | LABOR | Add on to tear out tile framed shower curb - per LF | LF | $11.98 | |
| SWRPMD | LABOR | Add on to tear out shower drain-for use w/ wtrprf membrane | EA | $19.17 | |
| TACK | LABOR | Tear out tacklessstrip and bag for disposal | LF | $1.04 | |
| TACKA | LABOR | Tear out tackless strip and bag for disposal - after hours | LF | $1.52 | |
| TACKS | LABOR | Tear out tackless strip and bag for disposal - Category 3 | LF | $1.27 | |
| TACKSA | LABOR | Tear out tackless strip and bag for disp - Cat 3 - aft hrs | LF | $1.88 | |
| TACKSN | LABOR | Tear out tackless strip, no bagging - Category 3 | LF | $1.07 | |
| TACKSNA | LABOR | Tear out tackless strip, no bagging- Cat3- after hrs | LF | $1.60 | |
| THERM | LABOR | Thermal imaging - (Bid Item) | EA | $0.00 | |
| TIL | LABOR | Tear out non-salv. tile & bag for disposal | SF | $2.82 | |
| TILA | LABOR | Tear out non-salv. tile & bag for disposal - after hours | SF | $4.14 | |
| TILN | LABOR | Tear outnon-salvageable tile, no bagging | SF | $2.31 | |
| TILNA | LABOR | Tear out non-salv. tile, no bagging - after hours | SF | $3.45 | |
| TILS | LABOR | Tear out non-salv. tile & bag - Category 3 water | SF | $4.14 | |
| TILSA | LABOR | Tear out non-salv. tile & bag -Cat 3 water - after hours | SF | $6.10 | |
| TILSN | LABOR | Tear out non-salv. tile, no bagging - Category 3 water | SF | $3.45 | |
| TILSNA | LABOR | Tear out non-salv. Tile,no bagging - Cat 3- afterhours | SF | $5.17 | |
| TLTD | LABOR | Toilet - Detach | EA | $51.20 | |
| TLTDA | LABOR | Toilet - Detach - after hours | EA | $76.77 | |
| TRAN | LABOR | Transport carpet for drying | SF | $0.38 | |
| TRI | LABOR | Tear out trim | LF | $0.53 | |
| TRIA | LABOR | Tear out trim - after hours | LF | $0.80 | |
| TRID | LABOR | Trim - Detach | LF | $0.91 | |
| TRIDA | LABOR | Trim - Detach - after hours | LF | $1.37 | |
| TRIM | LABOR | Tear out trim and bag for disposal - up to Cat 3 | LF | $0.98 | |
| TRIMA | LABOR | Tear out trim and bag for disposal - up to Cat 3 - aft hrs | LF | $1.37 | |
| TRIMT | LABOR | Add-on for tearing out trim/base from tile/grout | LF | $0.69 | |
| TRIMTA | LABOR | Add-on for tear out trim/base from tile/grout - after hrs | LF | $1.04 | |
| TUBD | LABOR | Bathtub - Detach | EA | $117.95 | |
| TUBDA | LABOR | Bathtub - Detach - after hours | EA | $176.93 | |
| ULAY | LABOR | Tear out non-salv underlayment & bag for disposal | EA | $1.68 | |
| ULAYA | LABOR | Tear out non-salv underlayment & bag - after hours | SF | $2.47 | |
| ULAYN | LABOR | Tear out non-salv underlayment, no bagging | SF | $1.45 | |
| ULAYNA | LABOR | Tear out non-salv underlayment, no bagging - after hours | SF | $2.19 | |
| ULAYS | LABOR | ear out non-salv underlayment & bag - Category 3 water | SF | $2.47 | |
| ULAYSA | LABOR | Tear outnon-salvunderlayment & bag - Cat 3 wtr - aft.hrs | SF | $3.68 | |
| ULAYSN | LABOR | Tear out non-salv underlayment, no bagging - Category 3 | SF | $2.19 | |
| ULAYSNA | LABOR | Tear out non-salv underlayment, no bagging - Cat 3- a/hrs | SF | $3.27 | |
| WALLF | LABOR | Fill holes created by wall cavity drying | EA | $1.42 | |
| WALLH | LABOR | Drill holes for wall cavity drying | EA | $0.58 | |
| WALLHA | LABOR | Drill holes for wall cavitydrying -afterhrs | EA | $0.81 | |
| WHD | LABOR | Water heater - Detach | SF | $88.65 | |
| WHDA | LABOR | Water heater - Detach - after hours | SF | $133.05 | |
| WSHD | LABOR | Washer/Washing machine - Detach | SF | $28.96 | |
| WSHDA | LABOR | Washer/Washing machine - Detach - after hours | SF | $43.45 | |
| EXTDMP | MARKET | Contaminated water dump fee - (Bid Item) | EA | ||
| BARRZ | MATERIAL | Peel & seal zipper | EA | $13.11 | |
| BARRZ+ | MATERIAL | Peel & seal zipper- heavy duty | EA | $16.31 | |
| BARRZA | MATERIAL | Peel & seal zipper - after hours | EA | $14.90 | |
| BARRZA+ | MATERIAL | Peel & seal zipper - heavy duty - after hours | EA | $18.10 | |
| DUCT6 | MATERIAL | Ducting - flexible - 6" round | LF | $1.42 | |
| DUCTLF | MATERIAL | Ducting - lay - flat | LF | $0.35 | |
| DUCTLF> | MATERIAL | Ducting - lay - flat - Large | LF | $0.45 | |
| FLCHM | MATERIAL | Chemical gas and odor neutralization cartridge - 16" x 16" | EA | $143.86 | |
| FLCHM> | MATERIAL | Chemical gas and odor neutralization cartridge - 24" x 24" | EA/DAY | $249.36 | |
| FLVAP | MATERIAL | Carbon vapor filter (for air scrubber) -16" x16" | EA | $69.86 | |
| FLVAP> | MATERIAL | Carbon vapor filter (for air scrubber)-24" x 24" | EA/DAY | $102.86 | |
| GRM | MATERIAL | Apply anti-microbial agent to [V} | SF | $0.27 | |
| GRMA | MATERIAL | Apply anti-microbial agent to [V} - after hours | SF | $0.39 | |
| GRMB | MATERIAL | Apply plant-based anti-microbial agent to [V} | SF | $0.28 | |
| GRMBA | MATERIAL | Apply plant-based anti-microbial agent to [V] - after hrs | SF | $0.40 | |
| GRMBIO | MATERIAL | Apply biological cleaning agent (spore-based) to [V} | SF | $0.28 | |
| GRMBIOA | MATERIAL | Apply bio cleaning agent (spore-based) to [V] - after hrs | SF | $0.40 | |
| HPAG | MATERIAL | Plastic bag - for hazardous material cleanup - Medium | EA | $1.99 | |
| HBAG< | MATERIAL | Plastic bag - for hazardous material cleanup - Small | EA | $1.20 | |
| HBAG> | MATERIAL | Plastic bag - for hazardous material cleanup - Large | EA | $3.64 | |
| HBAGG | MATERIAL | Plastic glove bag - for hazardous material cleanup | EA | $9.85 | |
| HBAGG> | MATERIAL | Plastic glove bag - for hazardous material cleanup - Large | EA | $10.16 | |
| HBOX | MATERIAL | Box and liner - for hazardous material cleanup - Medium | EA | $4.16 | |
| H BOX< | MATERIAL | Boxand liner - for hazardous material cleanup - Small | EA | $3.19 | |
| H BOX> | MATERIAL | Boxand liner - for hazardousmaterial cleanup- Large | EA | $9.11 | |
| HC14 | MATERIAL | Plastic container - hazardous material cleanup - 14 gl | EA | $47.55 | |
| HC30 | MATERIAL | Plastic container - hazardous material cleanup - 30 gl | EA | $56.05 | |
| HC60 | MATERIAL | Plastic container - hazardous material cleanup - 60 gl | EA | $122.05 | |
| HCON | MATERIAL | Plastic container - hazardous material cleanup - Medium | EA | $9.90 | |
| HCON-c | MATERIAL | Plastic container - hazardous material cleanup - Small | EA | $6.94 | |
| HCON> | MATERIAL | Plastic container - hazardous material cleanup - Large | EA | $16.55 | |
| MASKFL | MATERIAL | Floor protection -self-adhesive plastic film | SF | $0.49 | |
| MASKFLA | MATERIAL | Floor protection - self-adhesive plastic film - after hrs | SF | $0.66 | |
| MASKFLP | MATERIAL | Floor protection - cloth - skid resistant leak proof | SF | $0.88 | |
| MASKFP- | MATERIAL | Floor prot. - cloth - skid resist, leak proof, cleanable | SF | $0.89 | |
| MASKFPB | MATERIAL | Floor protection - cloth - skid resistant, breathable | SF | $1.09 | |
| MASKFPN | MATERIAL | Floor protection - neoprene - reusable | SF | $1.07 | |
| MASKV | MATERIAL | Mask and cover register / air return | EA | $3.73 | |
| MASKV> | MATERIAL | Mask and cover register / air return - Large | EA | $5.22 | |
| PPE | MATERIAL | Add for personal protective equipment (hazardous cleanup) | EA | $14.28 | |
| PPE+ | MATERIAL | Add forpersonal protective equipment - Heavy duty | EA | $38.97 | |
| PPEB | MATERIAL | Boots - waterproof latex - Disposable (per pair) | EA | $10.92 | |
| PPEE | MATERIAL | Eye protection - plastic goggles - Disposable | EA | $13.07 | |
| PPEG6 | MATERIAL | Personalprotectivegloves - Disposable (per pair) | EA | $0.32 | |
| PPEGHD | MATERIAL | Personal protective gloves - Heavy duty (per pair) | EA | $6.99 | |
| PPEM | MATERIAL | Personal protective mask (N-95) | EA | $3.23 | |
| PPER | MATERIAL | Disposable rain suit | EA | $18.76 | |
| PPERC | MATERIAL | Respirator cartridge - HEPA only (per pair) | EA | $16.04 | |
| PPERCM | MATERIAL | Respirator cartridge - HEPA& vapor&gas(per pair) | EA | $33.37 | |
| PPERCP | MATERIAL | PAPR cartridge - HEPA only (single cartridge) | EA | $27.04 | |
| PPERCPM | MATERIAL | PAPR cartridge - HEPA & vapor & gas (single cartridge) | EA | $52.83 | |
| PPERCPV | MATERIAL | PAPR cartridge - vapor only (single cartridge) | EA | $35.48 | |
| PPERCV | MATERIAL | Respirator cartridge - organic vapor & acid gas (per pair) | EA | $23.92 | |
| PPERF | MATERIAL | Respirator - Full face - multi-purpose resp. (perday) | DAY | $7.61 | |
| PPERH | MATERIAL | Respirator - Half face - multi-purpose resp. (per day) | DAY | $1.67 | |
| PPES | MATERIAL | Face shield - Disposable | EA | $5.95 | |
| PPPAPR | MATERIAL | Powered Air-Purifying Respirator (PAPR)-per day | DAY | $73.25 | |
| PPSAR | MATERIAL | Supply Air Respirator (SAR) - per day | DAY | $61.25 | |
| PROT | MATERIAL | Protect - Cover with plastic | SF | $0.30 | |
| PROTA | MATERIAL | Protect -Coverwith plastic - after hours | SF | $0.39 | |
| 55WR | MATERIAL | Temporary safety shower | EA | $11.98 | |
| TACKG | MATERIAL | Tackless strip guard | LF | $0.52 | |
| TACKGA | MATERIAL | Tackless strip guard - after hours | LF | $0.71 | |
| CALC | TEST | Calcium Chloride moisture test - per sample | EA | $91.18 | |
| DOPT | TEST | DOP test/inspection - per piece of equipment | EA | $65.00 | |
| TEST | TEST | Contamination - air or surface testing & lab analysis | EA | $131.25 | |
| TEST+ | TEST | Contamination - pre & post test - full service (Bid Item) | EA | $0.00 | |
| T ESTATP | TEST | Contamination - on-site ATP testing | EA | $26.80 | |